Interior Work

56 W 66TH STREET | Negative Waterproofing & Office Re-Build
Scope of Work:
-
Inject negative waterproofing to stop water infiltration at basement foundation wall.
-
Apply cementitious waterproofing at interior face brick foundation wall.
-
Install floor moisture system.
-
Rebuilt conference room and offices to its original condition.
-
Drilling of the basement wall to prepare waterproofing wall injection
-
Re-building of the offices and conference room

121 WASHINGTON PLACE | Kemperol Waterproofing
Scope of Work:
-
Provide full height Kemperol waterproofing at the shower walls on the North, South, and West elevations.
-
Provide Kemperol waterproofing at the height of 4" at the East wall.
-
Provide Kemperol waterproofing at the bathroom floor.
-
Scope of performed in three bathrooms.

225 W 86TH STREET | Kemperol Waterproofing
Scope of Work:
-
Provide full height Kemperol waterproofing at the shower walls on the North, South, and West elevations.
-
Provide Kemperol waterproofing at the height of 4" at the East wall.
-
Provide Kemperol waterproofing at the bathroom floor.
-
Scope of work performed in three bathrooms.